Developments In Review

City of Fernley Proposed Developments 2022

               Project Title Project Description
Project ID           
Location
Type
Year
Status
Project Info
B  :
Blue Beacon Truck Wash 1,313 Sq. Ft. Addition To Existing Building BP21-512
Commercial
2021
Building Permit In Process
 
:
Blue Beacon Truck Wash New Fire Line And Backflows For Fire System Under Review CP2022-002
Commercial
2022
Site Improvement Permit In Process
 
C  :
Clover Ranch Estates  28-Lot Single-Family Residential Subdivision CP2021-007
Residential
2021
Site Improvement Permit In Process
 
F  :
Fernley Business Park Boundary Line Adjustment Between Parcel #'s 021-392-19 And 021-392-20 BLA23001
Industrial
2023
Entitlement In Review
 
:
Fernley High School Public Utility Connections For New 48,550 Sq. Ft. Building CP2023-004
Commercial
2023
Site Improvement Permit In Process
:
Fernwood Village 54-Lot Single-Family Residential Subdivision CP2022-001
Residential
2022
Site Improvement Permit In Process
 
:
Fremont Street Intersection Resurfacing And Restriping Of Existing Road To Include Separate Right Turn Lane CP2022-006
-
2022
Site Improvement Permit In Process
 
:
Fernley Storage Mini Storage Facility With RV Storage BP21-594
Industrial
2021
Building Permit In Process
 
:
Fernley Storage Site Lighting, Parking, And Accessibility In Review  BP23-298
Industrial
2023
Site Improvement Permit In Process
 
:
Fernley Storage Off-Site Improvements Of Roadway, Sidewalk, Water, Sewer, And Storm Drain To Mull Lane CP2023-005
Industrial
2023
Site Improvement Permit In Process
 
G  :
Green Valley Ranch Road And Civil Improvements For Phase 6 Of Subdivision Under Review; 
Phase 6 - 54 Additional Single-Family Homes
CP2022-008
Residential
2022
Site Improvement Permit In Process
 
I  :
Izzy Estates Off-Site Improvements Of Roadway, Sidewalk, Water, Sewer, And Storm Drain For Future Subdivision CP2023-002
Residential
2023
Site Improvement Permit In Process
 
:
Izzy Estates Final Subdivision Map For A 20-Lot Single-Family Residential Subdivision FSM23001
Residential
2023
Entitlement In Review
 
L  :
Lickety-Split Express Wash 5,809 Sq. Ft. Automatic Car Wash BP23-200
Commercial
2023
Building Permit In Process
 
:
Lickety-Split Express Wash Off-Site Improvements Of Pavement, Sidewalk, Water, And Storm Drain For Automatic Car Wash CP2023-001
Commercial
2023
Site Improvement Permit In Process
 
N  :
Nevada Commerce Center Building B - 607,400 Sq. Ft. BP23-198
Industrial
2023
Building Permit In Process
 
:
Nevada Pacific Boulevard Offsite Improvements To Roadway, Water, Sewer, And Storm Drain For Future Commercial Development CP2022-005
Commercial
2022
Site Improvement Permit In Process
 
P  :
Panda Express Boundary Line Adjustment Between Parcel #'s 021-232-38 And 021-232-60 BLA23002
Commercial
2022
Entitlement In Review
 
R  :
Royal Oaks Floodplain Analysis Conditional Letter Of Map Revision Sent To The Federal Emergency Management Agency (FEMA) To Modify The Floodplain And Determine Base Flood Elevations For Improvements CP2019-010
-
2019
Site Improvement Permit In Process
 
V  :
Victory Logistics Floodplain Analysis Conditional Letter Of Map Revision Sent To The Federal Emergency Management Agency (FEMA) To Modify The Floodplain And Determine Base Flood Elevations For Improvements CP2020-002
-
2020
Site Improvement Permit In Process